Efficient early estimates of bridge interventions: Costs, required possession times and associated failure risks
Open access
Datum
2023Typ
- Conference Paper
ETH Bibliographie
yes
Altmetrics
Abstract
Due to recent technological advances and the accumulation of historical information related to bridge conditions and bridge maintenance interventions, many managers are in the position to make efficient systematic early estimates of future bridge interventions. If this was possible, it would facilitate communication between different actors within the intervention planning process, e.g., asset managers, production managers, capacity managers, and network developers. Consequently, this paper proposes a methodology to efficiently and systematically make early estimates of bridge interventions, their costs, required possession times and associated risks. The methodology is used in a case study to make early estimates of the possible interventions in different planning periods for a 50m-long masonry bridge located in Switzerland. The results indicate that the methodology has the potential to provide efficient and complete overviews of possible upcoming interventions on all bridges within a bridge portfolio. Once implemented in a digital environment, the methodology is likely to provide bridge managers with an improved way to determine the timing of detailed bridge investigations by engineering offices. Mehr anzeigen
Persistenter Link
https://doi.org/10.3929/ethz-b-000625504Publikationsstatus
publishedExterne Links
Buchtitel
Life-Cycle of Structures and Infrastructure SystemsSeiten / Artikelnummer
Verlag
CRC PressKonferenz
Ausgabe / Version
1st EditionThema
Infrastructure management; Bridges; Intervention planningOrganisationseinheit
03859 - Adey, Bryan T. / Adey, Bryan T.
02261 - Center for Sustainable Future Mobility / Center for Sustainable Future Mobility
02655 - Netzwerk Stadt u. Landschaft ARCH u BAUG / Network City and Landscape ARCH and BAUG
ETH Bibliographie
yes
Altmetrics