Planning transmission lines upside down: How earth cables are combined with overhead lines
Open access
Date
2018-10-22Type
- Conference Poster
ETH Bibliography
yes
Altmetrics
Abstract
The grid extension in Europe is in full swing and thereby, citizens’ demand on earth cables instead of overhead lines is steadily increasing. The keyword often used in this context is partial underground cabling, as the Swiss jurisprudence compels grid planners to suggest not only an overhead line but also a partial underground cabling when a new trans-mission line is planned. However, where can the areas suitable for partial underground cabling be located?
Geographic Information Systems in combination with Multi-Criterial Decision Analysis offer established tools for determining an optimal transmission line path. However, the approaches used so far do not offer satisfactory solutions when planning a combined – overhead or underground – transmission line. Therefore, we propose a procedural method that turns the planning process upside down by determining for each section the optimal path. Show more
Permanent link
https://doi.org/10.3929/ethz-b-000297911Publication status
publishedPublisher
Institute of Cartography and Geoinformation (IKG), ETH ZurichEvent
Subject
Geographic Information Science (GIS)Organisational unit
03901 - Raubal, Martin / Raubal, Martin